Description of Work: Construction of (7.917,00-mt) Sewerage, Stormwater and Irrigation Pipeline Displacement Projects at various location (CH between Gebze - Pendik Train Stations) for Marmaray CR3 Projects.(Asia Side)

Project Comprising of

  • Supply Plants & Equipments, Installations, Testing
  • Excavation: 37.083m³, Back Filling (Stabilized/Aggregate): 16.874m³ 
  • Const.&Inst. of Ø200-Ø600mm Concrete Pipes: 2.421,00 mt
  • ...

Total Contract Value   : 2.951.500,00 -EURO
Main Contractor   : Obrascon Huarte & Siemens J.V
Location   : Istanbul / TURKEY
Completed Date   : 2015

Share

‘MARMARAY CR3’ INFRASTRUCTURE PROJECT

Description of Work: Construction of (7.917,00-mt) Sewerage, Stormwater and Irrigation Pipeline Displacement Projects at various location (CH between Gebze - Pendik Train Stations) for Marmaray CR3 Projects.(Asia Side)

Project Comprising of

  • Supply Plants & Equipments, Installations, Testing
  • Excavation: 37.083m³, Back Filling (Stabilized/Aggregate): 16.874m³ 
  • Const.&Inst. of Ø200-Ø600mm Concrete Pipes: 2.421,00 mt
  • Const.&Inst. of Ø1000,1200mm R.Concrete Pipes: 2.570,00 mt
  • Const.&Inst. of Ø1400,1600mm R.Concrete Pipes: 2.165,00 mt
  • Const.&Inst. of Ø600-1000mm Steel (Spiral Welded) Pipes: 761,00 mt
  • Const.&Inst. of Ø200-800mm Iron Ductile Pipes&Fittings: 114.072-Ton
  • Const.&Inst. of Precast Concrete and Cast-insitu Manholes: 108,00 Nos
  • Trench Drag Boxes/Verbau (debth:3mt,width:0,81-4,81mt): 9.275,00 m²
  • Sheet Pilings (up to 8,00mt): 4.621m², Trench Drag Boxes: 8.790,00 m²
  • Construction of W/O, Air Relief Chambers: 37,00 Nos
  • Inst. of Butterfly, Elastomer Seated Gates, Air Relief Valves 

Total Contract Value : 2.951.500,00 -EURO
Main Contractor : Obrascon Huarte & Siemens J.V
Location : Istanbul / TURKEY
Completed Date : 2015