Sakarya (Osb-1) Infrastructure Project

Description of Work: Installation of 10.129,00-mt Main Sewerage and Stormwater Drainage Networking Pipelines at Sakarya City Industrial Area Zone#1

Project Comprising of

  • Supply Plants & Equipments, Installation, Testing
  • Const.&Inst. of Ø200- Ø600mm Concrete Pipes: 5.923,00 mt
  • Const.&Inst. of Ø1000,1200mm RCP Pipes: 1.836,00 mt
  • ...

Total Contract Value   : 3.680.000,00 -USD
Client   : Directorate of Sakarya Industry Zone
Location   : Adapazari / TURKEY
Completed Date   : 1996

Share

SAKARYA (OSB-1) INFRASTRUCTURE PROJECT

Description of Work: Installation of 10.129,00-mt Main Sewerage and Stormwater Drainage Networking Pipelines at Sakarya City Industrial Area Zone#1

Project Comprising of

  • Supply Plants & Equipments, Installation, Testing
  • Const.&Inst. of Ø200- Ø600mm Concrete Pipes: 5.923,00 mt
  • Const.&Inst. of Ø1000,1200mm RCP Pipes: 1.836,00 mt 
  • Const.&Inst. of Ø1400,1600mm RCP Pipes: 2.370,00 mt
  • Const.&Inst. of Precast Manholes: 103,00 Nos
  • Construction of Cast-in-situ Manholes: 16,00Nos
  • Sheet Pilings (up to 8,00mt): 12.192,00 m²

Total Contract Value : 3.680.000,00 -USD
Client : Directorate of Sakarya Industry Zone
Location : Adapazari / TURKEY
Completed Date : 1996