‘VAN CITY’ WASTE WATER TREATMENT PLANT

Description of Work: Construction of ‘Van City Waste Water Treatment Plant (21,440 m³/day) and Administration & Social Buildings’ Project Comprising of

  • Supply Plants & Equipments, Installation, Testing & Commissions
  • Excavations, Installation of Concrete, Formworks, Re-bars
  • MEP (Plumbing & Drainages, Fire Protection, Services & Distributions, Lighting, Heatings)
  • ...

Total Contract Value : 7.150.000,00 -USD
Client : General Dirc. of ILLERBANK (Bank of Province)
Location : Van City / TURKEY
Completed Date : 2002

Share

‘VAN CITY’ WASTE WATER TREATMENT PLANT

Description of Work: Construction of ‘Van City Waste Water Treatment Plant (21,440 m³/day) and Administration & Social Buildings’ Project Comprising of

  • Supply Plants & Equipments, Installation, Testing & Commissions
  • Excavations, Installation of Concrete, Formworks, Re-bars
  • MEP (Plumbing & Drainages, Fire Protection, Services & Distributions, Lighting, Heatings)
  • Floorings-Ceilings, Partition, Wall & Coverings, Doors & Windows, Furnitures
  • Active stabilization ponds with mechanical Aerators-Aeration Pools
  • All mechanical and electrical instrumentation works
  • Square/Rectangle Interlock Plaque Tiles(Granite/Basalt) (dif.sizes)
  • L Bordure Kerbs and Curves 700x150x300mm, Handicapped Walkstone
  • Sidewalk and Channel Stones (Granite/Basalt Sanded)
  • Managing Treatment Plant for a 2 year

Total Contract Value : 7.150.000,00 -USD
Client : General Dirc. of ILLERBANK (Bank of Province)
Location : Van City / TURKEY
Completed Date : 2002