‘RAILWAY ROUTES PROTECTION WALL’ CONSTRUCTIONS

Description of Work: Construction of ‘Retaining & Protection Walls between Kazlicesme to Yenikapı Railway Routes’ on Marmaray CR3 Railways.

Project Comprising of

  • Supply Plants & Equipments, Installation, Testing
  • Installation of C35 Concrete Castings: 5.370 m ³
  • Installation of Re-bars (Ø8-Ø32mm): 675,00 Ton
  • ...

Total Contract Value : 625.744,00 - USD
Client : Gama & Nurol & Taisie J.V
Location : Istanbul/TURKEY
Completed Date : 2012

Share

‘RAILWAY ROUTES PROTECTION WALL’ CONSTRUCTIONS

Description of Work: Construction of ‘Retaining & Protection Walls between Kazlicesme to Yenikapı Railway Routes’ on Marmaray CR3 Railways.

Project Comprising of

  • Supply Plants & Equipments, Installation, Testing
  • Installation of C35 Concrete Castings: 5.370 m ³
  • Installation of Re-bars (Ø8-Ø32mm): 675,00 Ton
  • Installation of Doka Double-sided Formworks: 9.250 m²
  • Installation of Base Slab Formworks: 1.150 m²
  • Inst. of (PVC)Water Stoper:2.985 mt,Expansion Joint: 384,00 mt
  • Installation of Wall, Floor, Climbing, Load-Bearing Safety systems
  • Installation of Timber, Compozit FW beams, Sheets, Floor props
  • C35 Concrete, Re-bars provided by Client (Labour Cost Contract)

Total Contract Value : 625.744,00 - USD
Client : Gama & Nurol & Taisie J.V
Location : Istanbul/TURKEY
Completed Date : 2012