Description of Work: Structural (Rough) Construction of ‘Feneryolu Train Station Project’ on Marmaray CR3 Railways Contracts.

Project Comprising of

  • Supply Plants & Equipments, Installation, Testing
  • Installation of C30 Concrete Castings: 4.494 m³
  • Installation of Re-bars (Ø8-Ø32mm): 508 Ton
  • ...

Total Contract Value : 1.743.600,10 - TL
Main Contractor : Obrascon Huarte & Siemens J.V
Location : Istanbul / TURKEY
Completed Date : 2017

Share

‘FENERYOLU TRAIN STATION’ STRUCTURAL PRJ.

Description of Work: Structural (Rough) Construction of ‘Feneryolu Train Station Project’ on Marmaray CR3 Railways Contracts.

Project Comprising of

  • Supply Plants & Equipments, Installation, Testing
  • Installation of C30 Concrete Castings: 4.494 m³
  • Installation of Re-bars (Ø8-Ø32mm): 508 Ton
  • Inst.of Doka Formwork:11.911 m²,Scaffoldings: 8.038 m³
  • Water Isolation Membrane (PVC 2mm): 2.185 m²
  • Geotextile(400gr/m²): 7.399 m², Sika Swelling Tape: 920,00 mt
  • XPS: 229m², Draincore: 1.768 m², Tar Painting: 795 m²
  • Inst. of Galvanized Strip (with Bransman Bolts): 800 mt
  • Inst. of Cooper Cable with fittings (50/95mm²): 1.050 mt
  • Drilling Conc. Surfaces/Epoxy Anchorings(30cm): 500 Nos
  • Earthing Rods, Inspection Pits, Air Terminals,
  • C40 Concrete, Re-bars provided by Client (Labour Cost Contract)

Total Contract Value : 1.743.600,10 - TL
Main Contractor : Obrascon Huarte & Siemens J.V
Location : Istanbul / TURKEY
Completed Date : 2017